📐"前 50 个企业查询可获得定制 3D 仓库设计" 计划
China's Pallet Racking Factory Since 2019
The Factory Behind 3000+ Warehouses Worldwide
Running out of warehouse storage — or planning a new facility? We are not a trading company. Geely Racks is a direct manufacturer with a 40,000 m² production facility, in-house engineering, and a decade of export experience — delivering certified racking to 30+ countries. Tell us your products and we will engineer the layout that maximizes your space.
0
Founded
0
Factory Area
0
Team Members
0
Countries Served
ISO 9001:2015Quality Certified
CE MarkedEU Compliant
SGS TestedThird-Party Verified
Direct FactoryNo Middlemen
40,000 m²Own Facility




2019
Manufacturing since
Our Story
Built by Warehouse Engineers, For Warehouse Owners
Fujian Geely Intelligent Logistics Equipment Co., Ltd. was founded in 2019 with a simple conviction: warehouse operators deserve to buy racking directly from the people who make it — with honest pricing, real engineering support, and no trading-company markups.
Today our 40,000 m² facility in Quanzhou, Fujian runs in-house roll-forming, automated welding and powder-coating lines. Our engineering team has designed and delivered 3000+ projects across Europe, North America, the Middle East and Southeast Asia.
Manufacturer, not middleman — you talk directly to the factory and its engineers.
Engineering-led — free 3D layouts and load calculations on every project.
Export-ready — six-language support and door-to-port logistics.
Find Your Fit
Which Racking System Matches Your Warehouse?
Before you request a quote, it helps to know which system fits your products, pallet size and handling method. Tell us your operation and our engineers will recommend the optimal layout — and send a free 3D design.
Get Free Recommendation
Selective Pallet Racking
- Best forGeneral FIFO, diverse SKUs
- 存储密度Standard
- Choose whenYou need direct access to every pallet
Drive-In / Drive-Through
- Best forHigh-volume, few SKUs
- 存储密度Very high
- Choose whenYou store large quantities of same item
Push-Back Racking
- Best forLIFO, medium SKU count
- 存储密度High
- Choose whenYou want density with fast picking
悬臂式货架
- Best forLong or bulky loads
- 存储密度N/A (open)
- Choose whenLoad has no front beam
Mezzanine Platform
- Best forMaximizing height
- 存储密度High (2–3 levels)
- Choose whenYou need storage above floor
Longspan Shelving
- Best forBoxes, spares, hand picking
- 存储密度中型
- Choose whenLighter goods picked manually
Plan Your Racking
Free Tools to Scope Your Project
Two calculators our engineers use on every call — now yours. Instant estimate.
Container Load Calculator
Estimate how many pallet positions fit in a 40HQ container.
—
Live Production Schedule
Real-time build slot at our Quanzhou factory.
Current month—
Standard selective racking15–20 days ex-works
Engineered systems30–40 days ex-works
Next available slot—
Inside the Factory
Real Production, Real Control
Owning our facility means we control quality, cost and lead time end-to-end.

Automated Roll-Forming
High-speed roll-forming lines produce uprights and beams with consistent tolerances.

Robotic Welding
Automated welding cells deliver strong, repeatable joints for structural integrity.

Electrostatic Powder Coating
60-80µm powder-coat finish for maximum corrosion resistance.



Zero-Damage Shipping
Export Packing Engineered for Ocean Transit
Cross-border racking lives or dies by its packing. We design the pack around your route so steel arrives rust-free and dent-free.
- IPPC-stamped timber, cardboard edge protectors and stretch wrap
- Air-bag bracing and desiccant for ocean routes
- Knock-down packing to maximize container space
Our Journey
Milestones That Built the Trust
2019
Factory Founded
Established in Quanzhou with our first roll-forming line.
2020
ISO 9001 & CE Certification
Achieved international quality management certifications.
2026
3000+ Projects Delivered
Trusted by clients in over 30 countries worldwide.


0
Projects Completed
0
Countries Served
0
Team Members
0
Structural Warranty
Certified & Compliant
Quality You Can Verify
ISO 9001:2015
Covers every process from raw steel to finished dispatch.
CE Marking
Declaration of conformity for European Economic Area.
SGS Tested
Third-party material and load testing documentation.
FEM / AS4084 / ANSI
Designed to comply with major international standards.
Europe (EU / UK): designed to FEM 10.2.02 / EN 15512.
12-year structural warrantyBacked by calculation reports.
Engineer response ≤ 24hDirect contact with senior team.
Verifiable certificatesSent prior to payment.
Audit before orderingOn-site or live video tour.
Why Buy Direct
A Real Factory — Not a Trading Company
As a direct manufacturer, we control quality, price and lead time end-to-end.

Factors
Geely Racks (Factory)
Trading Company
Production & QC
Own lines, full batch traceability
Outsourced, limited control
Pricing
Ex-factory direct rates
Middleman markups
What We Stand For
The Principles Behind Every Project
Quality Without Compromise
Certified materials and rigorous load testing on every batch.
Honest Direct Pricing
Transparent factory quotes free of hidden margin.
Long-Term Partnership
End-to-end engineering and installation assistance worldwide.
Global Reach
Delivering to 30+ Countries
EuropeGermany, UK, France
North AmericaUSA, Canada

Let's Talk
Ready to Work Directly With the Factory?
Send your warehouse requirements for a free 3D layout and quote within 24 hours.
Fast ResponseEngineers reply within 24 hours.
Free Design3D layout and CAD load calculations.
Contact Our Team
Required fields are marked with *
Client Voices
What Buyers Say
Verified
The 3D layout showed us exact capacities before commitment. Delivery was on schedule.

Lukas BrandnerLogistics Director, Germany
Verified
Factory-direct pricing saved significant costs versus local suppliers. Engineering support was excellent.

Emma JohanssonOperations Manager, Sweden
常见问题
Frequently Asked Questions
Are you a manufacturer or trading company?
We are a direct manufacturer operating a 40,000 m² facility in Quanzhou, Fujian.
What is your standard production lead time?
20-30 days for standard selective racking, 35-45 days for engineered systems.
Guide
Sourcing Racking From China Checklist
1
Confirm Factory Status
Verify live manufacturing lines.
2
Verify ISO & CE
Check active certification data.
3
Check Standards
Ensure FEM or AS4084 compliance.
4
Warranty Terms
Confirm long-term structural warranty.
5
Layout Engineering
Obtain CAD design prior to payment.
Due-Diligence Pack
Request ISO certificates, SGS reports, and business license.
Request Pack (WhatsApp)
2-Minute Factory Tour
Watch TourLet's Build Your Warehouse Together
Get a free 3D layout and factory-direct quotation within 24 hours.


