FAQ

FAQ

Explore key details on rack selection, customization, technical standards, installation, maintenance, certifications, and supplier verification. Get insights on cost, lead time, and tailored solutions. Provide your warehouse floor plan and cargo list for a free 3D simulation!

Warehouse Shelves FAQ Details

If you need more detailed technical parameters or customized solutions, please provide the warehouse floor plan and cargo list, and we will provide a free 3D simulation solution!

CategoryQuestionAnswerKey Specifications
Product Selection1. What are the ​applications of Shuttle Racking vs. Beam Pallet Racking?Shuttle stellingen: High-density storage for bulk SKUs (e.g., beverages, retail goods). Supports FIFO/FILO.
Beam Pallet Racking: General-purpose for forklift access. Max load: 4,500 kg/layer.
– Load capacity: Up to 4,500 kg/layer
– Channel width: 1.6–3.5 m
Product Selection2. How to choose racks based on ​warehouse conditions (height, floor load)?– ​Height: Drive-In Racking for warehouses >10m.
– ​Floor load: ≥3 tons/m² for Double Deep Racking.
– ​Equipment: Narrow Aisle Racking requires specialized forklifts (aisle width: 1.5–2m).
– Aisle width: 1.5–2m (Narrow Aisle)
– Floor load: ≥3 tons/m²
Customization3. Can racks be ​customized for non-standard layouts or loads?Yes. Adjust beam height (±50mm), depth, and modular expansion (e.g., Modular Racking). Light/medium/heavy tiers: 100–500kg, 500–2,000kg, 2,000–4,500kg per layer.– Beam height adjustment: ±50mm
– Load tiers: Light/Medium/Heavy
Technical Standards4. What ​materials and certifications do your racks meet?– ​Materiaal: Q235B cold-rolled steel (thickness ≥1.5mm uprights).
– ​Certifications: EN 15635, ISO 9001, GB 50011-2010 (seismic). Surface: Anti-rust coating (≥60μm).
– Coating thickness: ≥60μm
– Seismic resistance: 8-magnitude zones
Installation5. What ​site prep is needed for installation?– ​Floor: Flatness ≤5mm/2m, slope ≤2%.
– ​Environment: Humidity ≤70%, cold storage racks use -30°C-rated steel.
– ​Safety: 1.2m clearance for aisles and exits.
– Temperature range: -30°C to 60°C
– Clearance: ≥1.2m
Onderhoud6. How to ​maintain racks (e.g., Push Back Racking)?– ​Monthly checks: Bolt tightness, beam deformation (≤1‰ tolerance).
– ​Annual tests: Load capacity verification.
– ​Operations: Avoid forklift collisions; stack within design lines.
– Deformation limit: ≤1‰
– Impact protection: Guardrails & column protectors
Certifications7. Are racks ​certified to international standards (e.g., EN 15635)?Yes. Full compliance with EN 15635 (EU safety), EN 15512 (structural), and GB 50011-2010 (seismic). Third-party load test reports available.– Compliance: EN 15635, EN 15512, GB 50011-2010
Supplier Verification8. How to verify ​supplier qualifications?Request:
– Material test reports (steel composition).
– ISO 9001/14001 factory certifications.
– Third-party load test certificates.
– Required docs: ISO certs, test reports
Cost & Lead Time9. What is included in the ​total cost?– ​Hardware: 60–70% (racks, accessories).
– ​Services: Design (5–10%), installation (10–15%).
– ​Logistics: FOB/CIF terms.
– MOQ: 1 set
– Warranty: 3–5 years (structural)
Cost & Lead Time10. What is the ​delivery timeline?– ​Standaard: 7–15 days (in stock).
– ​Custom: 20–45 days (design + production).
– Lead time: 20–45 days (custom)

"Het is tijd om uw magazijn te upgraden! Zeg vaarwel tegen grondangst en bespaar miljoenen dollars met deze slimme uitbreidingsoplossing"

”Terwijl uw concurrenten nog steeds de grondkosten van nieuwe magazijnen berekenen, hebt u het volgende bereikt door geelyracks space reconstruction solution: ​
✓ Opslagdichtheid verhoogd met 184%
✓ Operationele kosten verlaagd met 37%
✓ Snelheid orderverwerking verhoogd met 65%
En dat alles zonder te hoeven verhuizen of te sluiten.”

Contact met onze expert

Warshause logistiek
Inventariscontrole van magazijnrekken met werknemers in veiligheidsuitrusting die zijn uitgerust met een tablet

Введите текст заголовка

Введите текст заголовка

Введите текст заголовка