CategoryQuestionAnswerKey Specifications
Product Selection1. What are the ​applications of Shuttle Racking vs. Beam Pallet Racking?Ŝatla bretsistemo: High-density storage for bulk SKUs (e.g., beverages, retail goods). Supports FIFO/FILO.
Beam Pallet Racking: General-purpose for forklift access. Max load: 4,500 kg/layer.
– Load capacity: Up to 4,500 kg/layer
– Channel width: 1.6–3.5 m
Product Selection2. How to choose racks based on ​warehouse conditions (height, floor load)?– ​Height: Drive-In Racking for warehouses >10m.
– ​Floor load: ≥3 tons/m² for Double Deep Racking.
– ​Equipment: Narrow Aisle Racking requires specialized forklifts (aisle width: 1.5–2m).
– Aisle width: 1.5–2m (Narrow Aisle)
– Floor load: ≥3 tons/m²
Customization3. Can racks be ​customized for non-standard layouts or loads?Yes. Adjust beam height (±50mm), depth, and modular expansion (e.g., Modular Racking). Light/medium/heavy tiers: 100–500kg, 500–2,000kg, 2,000–4,500kg per layer.– Beam height adjustment: ±50mm
– Load tiers: Light/Medium/Heavy
Technical Standards4. What ​materials and certifications do your racks meet?– ​Material: Q235B cold-rolled steel (thickness ≥1.5mm uprights).
– ​Certifications: EN 15635, ISO 9001, GB 50011-2010 (seismic). Surface: Anti-rust coating (≥60μm).
– Coating thickness: ≥60μm
– Seismic resistance: 8-magnitude zones
Installation5. What ​site prep is needed for installation?– ​Floor: Flatness ≤5mm/2m, slope ≤2%.
– ​Environment: Humidity ≤70%, cold storage racks use -30°C-rated steel.
– ​Sekureco: 1.2m clearance for aisles and exits.
– Temperature range: -30°C to 60°C
– Clearance: ≥1.2m
Maintenance6. How to ​maintain racks (e.g., Push Back Racking)?– ​Monthly checks: Bolt tightness, beam deformation (≤1‰ tolerance).
– ​Annual tests: Load capacity verification.
– ​Operations: Avoid forklift collisions; stack within design lines.
– Deformation limit: ≤1‰
– Impact protection: Guardrails & column protectors
Certifications7. Are racks ​certified to international standards (e.g., EN 15635)?Yes. Full compliance with EN 15635 (EU safety), EN 15512 (structural), and GB 50011-2010 (seismic). Third-party load test reports available.– Compliance: EN 15635, EN 15512, GB 50011-2010
Supplier Verification8. How to verify ​supplier qualifications?Request:
– Material test reports (steel composition).
– ISO 9001/14001 factory certifications.
– Third-party load test certificates.
– Required docs: ISO certs, test reports
Cost & Lead Time9. What is included in the ​total cost?– ​Hardware: 60–70% (racks, accessories).
– ​Services: Design (5–10%), installation (10–15%).
– ​Logistics: FOB/CIF terms.
– MOQ: 1 set
– Warranty: 3–5 years (structural)
Cost & Lead Time10. What is the ​delivery timeline?– ​Standard: 7–15 days (in stock).
– ​Custom: 20–45 days (design + production).
– Lead time: 20–45 days (custom)

"Estas tempo modernigi vian magazenon! Adiaŭu teran angoron kaj ŝparu milionojn da dolaroj per ĉi tiu inteligenta ekspansia solvo."

Dum viaj konkurantoj ankoraŭ kalkulas la terenokoston de novaj magazenoj, vi atingis la jenon per geelyracks-a space reconstruction solution: ​
✓ Stokdenseco pliiĝis je 184%
✓ Funkciaj kostoj reduktitaj je 37%
✓ Rapideco de mendo-plenumo pliiĝis je 65%
Ĉio ĉi sen la bezono translokiĝi aŭ fermiĝi.”

Kontakto kun nia fakulo

Stokeja loĝistiko
Stoka breto-inventaro-kontrolo kun laboristoj ekipitaj per tablojdoj kaj sekurecaj vestoj

Введите текст заголовка

Введите текст заголовка

Введите текст заголовка